See the link to “Roofing” at the top of the page for in depth detail of approved roofing for each phase in Fairwinds. The developer can change this for new phases. Existing phases are governed by the Building Scheme registered on title and the only way this can be modified is by modifying the registered Building Scheme which is highly unlikely to happen. You can consult with the developer if you wish to deviate from the Building Scheme roofing requirements and they may consider giving approval on a cases by case basis.
Leave A Comment